The second pocket door was installed.
Odds and Ends
April 28th & 29th, 2009
Hooked up the water tank, wired the pump & We've got water!!

The second pocket door was installed.
Almost finished up with the rough-in plumbing.

Insulation is going great! We are almost ready to staple up the vapor barrier.
My brother came to help & I managed to get him on the ladder, on top of the scaffolding. =)
He helped put the plastic up in the vaulted area. Which is no easy task!!
The second pocket door was installed.
Subscribe to:
Posts (Atom)