July 6th, 2008
For the past 2 1/2days, we have been connecting the trusses to each other...
(these are called strongbacks) & we added Ribbons to the outside edge of each truss to connect them together.
(these are called strongbacks) & we added Ribbons to the outside edge of each truss to connect them together.
Including a cute lil' wall that I made for between the stairs and the garage.
The 2nd delivery of lumber allowed us to be able to work on the cantilevered area for the Master Bdrm.