Ready for the Electrical Inspection

April 4th & 5th

Put up the walls for the walk-in shower.
Built another wall in the utility room in the basement.

Ran wire to outlets in the island, smoke alarms & newly added receptacles in the shower walls.












Put a "ceiling" on the 2 free standing rooms in the vaulted area. The bathroom and the mudroom closet now have a ceiling.

Saturday afternoon, we had 2 guest fly in for a visit.

Moved some insulation so that all of our wires are visible for the inspector.