June 13th & 14th, 2009 Texture was applied to all the ceilings.
Once the texture was dry we had to blow all the fine sheetrock dust off the walls and hopefully out the window.
Once done with that, it was time to plastic all the windows,tape all electrical boxes, plumbing etc. and cover the subfloor from the primer and paint splatter.
Scaffolding & ladders set up...we are ready to spray primer on all the walls and ceilings.
After the primer is sprayed on the wall, it then needs to be back rolled. Gotta catch them drips!
The primer covered the mud lines very nicely. Nice fresh white walls......but not for long.
Next Step...PAINT!