Feb 6th thru Feb 10th

Every night this week, work was done in the basement. The most time consuming was preparing the drain from the bathtub. After many trips to Home Depot, we were finally able to set the tub in place...permanently. With everything measured out and marked perfectly, we slopped down some ready mix cement and slowly set the tub in its place.

The wall between the bathroom and the office was next to go up. The room with the pipe sticking out of it, is the office.
....yes it should be on the bathroom side of the wall...don't ask.
We now have 3 fully framed rooms.
The utility room, bathroom and office.