Tile, Doors & Cabinets
July 25th & 26th, 2009
On Friday, the shower and tub walls were tiled.

On Saturday, I measured, taped and painted the tan stripe in the little bathroom. Besides needing a few touch-ups, it turned out pretty good.
STILL polyurethaning doors and other misc. wood pieces.
...just when we think we are done with the staining and polyurethane....The 20 ft. skirtboards and handrail for the stairs are delivered.
Worked on kitchen cabinets all weekend. Countertops are being delivered and installed in just a few days.