Travertine and Ceramic tile

July 20th, 2009
Built a frame around the tub for tiling.










The guys hired to do the tiling, put down the remaining hardibacker board in the rooms to be tiled.















Then Travertine was put in the kitchen.











Pantry & little bathroom had tiles cut, spaced out & ready for the next day.















July 21st
Day 2, Travertine in the laundry room.
It looks wonderful!

















The Master bath floor was also done today.


















The shower bed was poured....













July 22nd
..and the next day, they tiled the floor.



No comments: