Built a frame around the tub for tiling.
Then Travertine was put in the kitchen.
Day 2, Travertine in the laundry room.
It looks wonderful!
The Master bath floor was also done today.
The shower bed was poured....
July 22nd..and the next day, they tiled the floor.
No comments:
Post a Comment